Current construction sites of Montagi Company
In process of erection
Erection of the coal and limestone storage and handling systems at Maritsa East 1 power station. The scope of works includes: Erection of two stacker-reclaimers 661t each, Coarse Crusher House 684t, Fine Crusher House 198t, Wagon unloading station 460t, transfer towers and belt conveyers. Contractor: Sandvik Bulgaria EOOD.



-
Flue gas desulphurisation project in Maritsa East 2 Thermal Power Plant. Electrical installation works and Instrumentation. The scope of works includes: installation of cable ways, fabrication and erection of cable bridges, installation and connection of cables, indoor and outdoor lighting, substations, transformers installation, grounding and lightning systems, instrumentation and technical assistance for commissioning works.
Contractor: Elin GmbH and Co., branch of Sofia.


-
Metropoliten of Sofia, Electrical installation works, Stations 9, 11 and 12, Installation works in substations, power systems, middle voltage power cables, cable ways, low voltage cables, lighting, Automation. Contractor: Start Egineering JSCo.
-
Factory for grain processing at town Gorna Malina with capacity 30000 l spirits for bio fuel per day. Execution of erection of technological equipment, steel structures, erection of steam ducts, electrical and instrumentation works.


-
Repairing works of steel structures for boiler house in Thermal power plant Maritsa East 1, Galabovo. Contractor: Alstom Bulgaria EOOD

-
Execution of installation works in biofuel factory Euroetil EOOD, town Alfatar. Erection of steam line for straw burning, pipe rack, air and steam ducts. Contractor: Euroetil EOOD.